z6尊龙官网

      Service hotline:

      0315-5913666

      +86-18931500255

      Domestic > Tonghua Mining Group Babao Coal Preparation Plant
      42通化矿业集团八宝选煤厂.jpg
      • 42通化矿业集团八宝选煤厂.jpg

      Tonghua Mining Group Babao Coal Preparation Plant

      Type: Coking coal preparation plant

      Scale: 2.50Mt/a

      Contracting mode: partial contracting, new construction projects

      Process: The 50-0mm raw coal is fed into a three product heavy medium cyclone without desliming, classification, and pressure. Coarse coal slurry is sorted by the coal slurry heavy medium cyclone, fine coal slurry is sorted by a flotation machine, and flotation clean coal is dehydrated and recovered by a horizontal settling filtration centrifugal dewatering machine and a filter press. The flotation tail coal is collected using a two-stage concentration process. After the tail coal slurry water is concentrated in the thickener, it is dehydrated and recovered by a horizontal settling filtration centrifugal dewatering machine and a filter press. The washing water is closed loop, environmentally friendly and energy-saving.


        XML地图